top of page

Access and Maintenance
Strategy Support

Comprehensive design service for Rope Access Methodology, BS7883:2019 Design Service and Façade Access & Maintenance (A&M) Strategies.

KaydeeSayfa offers a comprehensive Access and Maintenance Strategy design service for Multi-Storey High-Risk Developments. As early as RIBA Stage 2, Architects and Developers must demonstrate that consideration has been given for the methods employed by future users of the building for access and maintenance of the building façade.


As part of this service our Technical Team will provide a collection of in-depth strategy documents for the method of accessing the building's façade. Utilising over two decades of safety industry experience and knowledge our team will provide a fully comprehensive & compliant document for use in the BSR Gateway 2 submission.

BIM Modelling of Rope Access for Glass Replacement

WHEN DO YOU REQUIRE AN A&M STRATEGY?

RIBA Constrution

The Access & Maintenance Strategy forms part of the BSR application for high-risk multi-storey developments and it's absence from the application can cause delays to the developments approval. BSA Gateway Two is a critical checkpoint in the approval process for High-Risk construction projects in the UK. In order to progress through Gateway 2 project teams must demonstrate at least a consideration to the future access and maintenance of the building in order to progress to the build phase.

WHAT IS INCLUDED IN A KAYDEESAYFA A&M STRATEGY?

As part of the Access & Maintenance Strategy service our experienced technical team will provide a series of in-depth documents demonstrating the methodology and systems involved in safely accessing areas at height including the building's façade to perform the required maintenance

​

In addition to the core strategy documents, KaydeeSayfa will manage the dialogue with other Project Stakeholders to ensure cohesion between the proposed methodology and other trades minimising potential clashes between the proposed strategy and practical implementation of the A&M strategy.


From a commercial perspective our strategy will include a lifetime cost analysis of the proposed scheme to demonstrate the cost benefits of the proposed the proposed solutions.

What is in a Access & Maintenance Strategy?

WHAT IF I ALREADY HAVE AN A&M STRATEGY?

Given the importance of an Access & Maintenance Strategy for a high-risk development's BSR approval, an A&M strategy should already be in place before arriving at RIBA Stage 4 / BSR Gateway 2. However, often times key information and documents may be absent or under-developed, which can cause significant delays to the BSR approval. To ensure your A&M Strategy meets the requirements for Gateway 2, we offer additional services to support your application.

BS7883:2019 Design Service
Rope Methodology.png

These additional service packages are available as stand-alone services to support your projects progress in the design phase. The Rope Access Methodology is used to indicate means in which the abseilers will carry out the cleaning and maintenance of the building's façade. The Rope Access Methodology would identify amongst other details: the access points, required rope access systems, and façade coverage.

 

The BS7883:2019 Design Service will provide a detailed system layout and fixing detail of the proposed systems in the strategy to provide a fully compliant means of safely accessing and using the façade access systems. In line with BS7883:2019 our technical team will support in the product of Technical files to ensure that when installed the solution meets the legal requirements of the standard. 

WHY WORK WITH KAYDEESAYFA?

We are a BSIF & IRATA specialist subcontractor with over 20 years of industry experience in the height safety & façade access market. Equipped with an in-house technical team and experienced installers we have delivered full Façade Access Solutions for some of the largest developments across the UK.

​​

In addition to early design & Gateway 2 support, as an experienced subcontract installer, our team are able to source and install the proposed systems detailed in the strategy as part of the height safety and façade access construction package. By being involved from an early stage we are able to take a streamlined and proactive approach to the sourcing and installation of the systems reducing labour and product lead-times minimising potential disruption to the project schedule.

Screenshot 2025-06-06 171421_edited.jpg

TECHINCAL DESIGN

Full technical design support from access strategy through to construction issue drawings

All_products 19_edited.jpg

SOURCING

Access to competitive rates for industry leading façade access systems

EdgeSeil Bases and FallSecure Line - Tower Bridge Court - 2024_edited.jpg

INSTALLATION

Professional Operations Teams capable of delivering large scale installation phases nationwide

Find Out More 

To learn more about how our team can support your Access & Maintenance Strategy & wider Façade Access Solution, speak to our team.

bottom of page